This project contains two main buildings covered by natural cladding of local stones and connected with glass & steel links .The ED built a multipurpose hall on the roof (Link Area) between the two wings in order to use it as Exhibition Hall.
- Status: Completed
- Area: 5500 m²
- Cost: 4.3 million JD
- Period of Construction: 3 years.